OUR PROCESS
You may be wondering how we make it possible to complete a full bathroom renovation in a week. We’ve been perfecting our process for a while, to make it as quick and convenient for you as possible.
We’ve streamlined our work down to a 5-step process, and here’s how we do it:
Monday
- We show up on time, bright and early, with a smile!
- We put down protective shields on all areas that may be affected by renovations.
- We complete the entire demolition and remove everything necessary (including all garbage post-demolition).
Tuesday
- We take care of anything to do with plumbing.
- If we are installing a new tub, this is the day on which we do just that.
- If we are instead creating a shower stall, we complete the frame for it, pre-slope the floor, install the shower liner and the complete the final slope.
- In either case, we finish drywall installation on this day and lay down the first coat of plaster.
Wednesday
- You can expect Wednesday to be the busiest renovation day, so we may stay a little late!
- We do a full water-proofing job of your entire tub or shower stall using Redgard.
- We install all your tiles on this day (this is the stage that takes the longest, and is also one of the most important).
Thursday
- We complete all grouting that needs to be done.
- We install your glass enclosure.
- We paint the walls in your bathroom.
- We remove all garbage left behind.
Friday
This will likely be your favorite day!
- Vanity installation.
- Installation of all faucets.
- Installation of mirror, light fixtures, towel bar, and toilet paper holders.
- All caulking and silicone installation.
- Final, though rough clean up!